Logo of Hydro Tasmania Logo of Hydro Tasmania
  • Our energy future
  • Our energy system
  • Sustainability and community
  • Water
  • Things to do
  • Stories and news
Logo of Hydro Tasmania Logo of Hydro Tasmania
Alerts
  • 8 December 2025 Maintenance

    Poatina – boil water

  • 8 December 2025 Maintenance

    Lake Plimsoll – boat ramp closed when lake level is high

  • 8 December 2025 Maintenance

    Lake Mackintosh – campground and boat ramps closed when lake level is high

  • 8 December 2025 Maintenance

    Gowrie Park – do not consume water

  • 8 December 2025 Maintenance

    Bailey Bridge – closed

All alerts
Logo of Hydro Tasmania Logo of Hydro Tasmania
Search

Common search

  • Water

  • Tarraleah

  • Lake level

  • Plant

  • Environmental handbook

  • Our energy future
  • Our energy system
  • Sustainability and community
  • Water
  • Things to do
  • Stories and news
  • Careers
  • About us
  • Contractor HSE
  • Education
  • Resource hub
Alerts
5
Our energy future
  • Upgrading our existing system
  • Building new capacity
  • Enabling wind and solar
Our energy future
Our energy system
  • Our power stations
  • How energy works
  • Powering Bass Strait islands
Our energy system
Sustainability and community
  • Conservation
  • Climate
  • Community
  • Cultural heritage
  • Diversity, equity and inclusion
Sustainability and community
Water
  • Water information
  • Using our water
Water
Things to do
  • Waddamana Heritage Site and Highlands Power Trail
  • Visitor information and safety
Things to do
Stories and news
  • The Spill
  • Media centre
Stories and news
Upgrading our existing system
  • Gordon Power Station
  • Edgar Dam
  • West Coast refurbishment program
Upgrading our existing system
Building new capacity
  • Cethana pumped hydro
  • Tarraleah redevelopment
Building new capacity
Our power stations
  • Bass Strait islands
  • Yingina / Great Lake
  • Mersey-Forth
  • West Coast
  • Derwent
  • Gordon–Pedder
  • Wind
  • Tamar Valley Power Station
Our power stations
Community
  • Previous grants awarded
  • Join the conversation
Community
Diversity, equity and inclusion
  • Aboriginal and Torres Strait Islander Action Plan
  • Hydro yarns in Lutruwita
Diversity, equity and inclusion

Our energy future

  • Upgrading our existing system
  • Building new capacity
  • Enabling wind and solar
Our energy future
  • Gordon Power Station
  • Edgar Dam
  • West Coast refurbishment program
Upgrading our existing system
  • Cethana pumped hydro
  • Tarraleah redevelopment
Building new capacity

Our energy system

  • Our power stations
  • How energy works
  • Powering Bass Strait islands
Our energy system
  • Bass Strait islands
  • Yingina / Great Lake
  • Mersey-Forth
  • West Coast
  • Derwent
  • Gordon–Pedder
  • Wind
  • Tamar Valley Power Station
Our power stations

Sustainability and community

  • Conservation
  • Climate
  • Community
  • Cultural heritage
  • Diversity, equity and inclusion
Sustainability and community
  • Previous grants awarded
  • Join the conversation
Community
  • Aboriginal and Torres Strait Islander Action Plan
  • Hydro yarns in Lutruwita
Diversity, equity and inclusion

Water

  • Water information
  • Using our water
Water

Things to do

  • Waddamana Heritage Site and Highlands Power Trail
  • Visitor information and safety
Things to do

Stories and news

  • The Spill
  • Media centre
Stories and news

More

  • Careers
  • About us
  • Contractor HSE
  • Education
  • Resource hub
Wind watermark

Media releases

15 September 2017
Agreement with Norske Skog Boyer Mill

Hydro Tasmania has reached an agreement with Norske Skog that will help Tasmania manage the current unprecedented low water storage situation, due to low inflows and the current Basslink outage.

15 September 2017
EPA decision on operation of temporary diesel generation

Hydro Tasmania has welcomed today’s announcement by the Environment Protection Authority (EPA) that it will allow the start of operation of temporary diesel generators at Catagunya Power Station.

15 September 2017
Basslink update

An update on Basslink was provided on 8 March by Basslink Pty Ltd.

15 September 2017
Update on Energy Supply Plan

An update on the Energy Supply Plan was provided on 7 March by the Energy Minister Matthew Groom and Hydro Tasmania.

15 September 2017
Diesel generation work begins at Port Latta

Site works have begun to enable the installation of around 20 megawatts (MW) of temporary diesel generation at Port Latta. The work is part of Hydro Tasmania’s statewide effort to protect and secure Tasmania’s energy needs in response to the combination of several months of unprecedented low inflows and an extended Basslink outage.

311 to 320 of 430
  • Previous
  • Page 28
  • Page 29
  • Page 30
  • Page 31
  • Current page 32
  • Page 33
  • Page 34
  • Page 35
  • Page 36
  • Next
Hydro Tasmania
Our energy future
  • Building new capacity
  • Upgrading our existing system
  • Enabling wind and solar
Our energy system
  • Our power stations
  • How energy works
  • Powering Bass Strait islands
Sustainability and community
  • Conservation
  • Climate
  • Community
  • Cultural heritage
  • Diversity, equity and inclusion
Things to do
  • Visitor information and safety
  • Waddamana Heritage Site and Highlands Power Trail
Water
Careers
About us
Education
Resource hub
The Spill
Contractor HSE
Contact us
Momentum Energy
Entura
Media centre Privacy
Hydro Tasmania © 2026. All rights reserved.