Logo of Hydro Tasmania Logo of Hydro Tasmania
  • Our energy future
  • Our energy system
  • Sustainability and community
  • Water
  • Things to do
  • Stories and news
Logo of Hydro Tasmania Logo of Hydro Tasmania
Alerts
  • 8 December 2025 Maintenance

    Poatina – boil water

  • 8 December 2025 Maintenance

    Lake Plimsoll – boat ramp closed when lake level is high

  • 8 December 2025 Maintenance

    Lake Mackintosh – campground and boat ramps closed when lake level is high

  • 8 December 2025 Maintenance

    Gowrie Park – do not consume water

  • 8 December 2025 Maintenance

    Bailey Bridge – closed

All alerts
Logo of Hydro Tasmania Logo of Hydro Tasmania
Search

Common search

  • Water

  • Tarraleah

  • Plant

  • Lake level

  • Environmental handbook

  • Our energy future
  • Our energy system
  • Sustainability and community
  • Water
  • Things to do
  • Stories and news
  • Careers
  • About us
  • Contractor HSE
  • Education
  • Resource hub
Alerts
5
Our energy future
  • Upgrading our existing system
  • Building new capacity
  • Enabling wind and solar
Our energy future
Our energy system
  • Our power stations
  • How energy works
  • Powering Bass Strait islands
Our energy system
Sustainability and community
  • Conservation
  • Climate
  • Community
  • Cultural heritage
  • Diversity, equity and inclusion
Sustainability and community
Water
  • Water information
  • Using our water
Water
Things to do
  • Waddamana Heritage Site and Highlands Power Trail
  • Visitor information and safety
Things to do
Stories and news
  • The Spill
  • Media centre
Stories and news
Upgrading our existing system
  • Gordon Power Station
  • Edgar Dam
  • West Coast refurbishment program
Upgrading our existing system
Building new capacity
  • Cethana pumped hydro
  • Tarraleah redevelopment
Building new capacity
Our power stations
  • Bass Strait islands
  • Yingina / Great Lake
  • Mersey-Forth
  • West Coast
  • Derwent
  • Gordon–Pedder
  • Wind
  • Tamar Valley Power Station
Our power stations
Community
  • Previous grants awarded
  • Join the conversation
Community
Diversity, equity and inclusion
  • Aboriginal and Torres Strait Islander Action Plan
  • Hydro yarns in Lutruwita
Diversity, equity and inclusion

Our energy future

  • Upgrading our existing system
  • Building new capacity
  • Enabling wind and solar
Our energy future
  • Gordon Power Station
  • Edgar Dam
  • West Coast refurbishment program
Upgrading our existing system
  • Cethana pumped hydro
  • Tarraleah redevelopment
Building new capacity

Our energy system

  • Our power stations
  • How energy works
  • Powering Bass Strait islands
Our energy system
  • Bass Strait islands
  • Yingina / Great Lake
  • Mersey-Forth
  • West Coast
  • Derwent
  • Gordon–Pedder
  • Wind
  • Tamar Valley Power Station
Our power stations

Sustainability and community

  • Conservation
  • Climate
  • Community
  • Cultural heritage
  • Diversity, equity and inclusion
Sustainability and community
  • Previous grants awarded
  • Join the conversation
Community
  • Aboriginal and Torres Strait Islander Action Plan
  • Hydro yarns in Lutruwita
Diversity, equity and inclusion

Water

  • Water information
  • Using our water
Water

Things to do

  • Waddamana Heritage Site and Highlands Power Trail
  • Visitor information and safety
Things to do

Stories and news

  • The Spill
  • Media centre
Stories and news

More

  • Careers
  • About us
  • Contractor HSE
  • Education
  • Resource hub
Wind watermark

Media releases

18 November 2019
The power of water draws crowds at Tarraleah

Around 200 people have snapped up free tickets to take a first-hand look at the Tarraleah Power Station in the Central Highlands.

18 November 2019
Clean energy generates Tasmanian hydrogen opportunities

New analysis from Hydro Tasmania shows the state is in a unique position to lead the nation in the production of green hydrogen from clean energy sources.

1 November 2019
A hub of energy activity

Hydro Tasmania is pumped to be a part of the Cradle Coast Future Energy Hub, launched today in Burnie.

30 October 2019
Working together to achieve a clean energy future

New analysis from Hydro Tasmania shows the Battery of the Nation initiative offers significant potential for Tasmania and Victoria to work together to achieve an affordable, reliable clean energy future.

18 October 2019
Market update regarding Basslink bidding instructions

Hydro Tasmania has today commenced instructing Basslink Pty Ltd (BPL) to bid Basslink’s capacity, above certain levels, at the Market Price Cap.

161 to 170 of 430
  • Previous
  • Page 13
  • Page 14
  • Page 15
  • Page 16
  • Current page 17
  • Page 18
  • Page 19
  • Page 20
  • Page 21
  • Next
Hydro Tasmania
Our energy future
  • Building new capacity
  • Upgrading our existing system
  • Enabling wind and solar
Our energy system
  • Our power stations
  • How energy works
  • Powering Bass Strait islands
Sustainability and community
  • Conservation
  • Climate
  • Community
  • Cultural heritage
  • Diversity, equity and inclusion
Things to do
  • Visitor information and safety
  • Waddamana Heritage Site and Highlands Power Trail
Water
Careers
About us
Education
Resource hub
The Spill
Contractor HSE
Contact us
Momentum Energy
Entura
Media centre Privacy
Hydro Tasmania © 2026. All rights reserved.