Logo of Hydro Tasmania Logo of Hydro Tasmania
  • Our energy future
  • Our energy system
  • Sustainability and community
  • Water
  • Things to do
  • Stories and news
Logo of Hydro Tasmania Logo of Hydro Tasmania
Alerts
  • 18 February 2026 Maintenance

    Planned Upgrade Works at Trevallyn Power Station Intake (March–April)

  • 8 December 2025 Maintenance

    Poatina – boil water

  • 8 December 2025 Maintenance

    Lake Plimsoll – boat ramp closed when lake level is high

  • 8 December 2025 Maintenance

    Lake Mackintosh – campground and boat ramps closed when lake level is high

  • 8 December 2025 Maintenance

    Gowrie Park – do not consume water

All alerts
Logo of Hydro Tasmania Logo of Hydro Tasmania
Search

Common search

  • Water

  • Tarraleah

  • Lake level

  • Plant

  • Lake levels

  • Our energy future
  • Our energy system
  • Sustainability and community
  • Water
  • Things to do
  • Stories and news
  • Careers
  • About us
  • Contractor HSE
  • Education
  • Resource hub
Alerts
5
Our energy future
  • Upgrading our existing system
  • Building new capacity
  • Enabling wind and solar
Our energy future
Our energy system
  • Our power stations
  • How energy works
  • Powering Bass Strait islands
Our energy system
Sustainability and community
  • Conservation
  • Climate
  • Community
  • Cultural heritage
  • Diversity, equity and inclusion
Sustainability and community
Water
  • Water information
  • Using our water
Water
Things to do
  • Waddamana Heritage Site and Highlands Power Trail
  • Visitor information and safety
Things to do
Stories and news
  • The Spill
  • Media centre
Stories and news
Upgrading our existing system
  • Gordon Power Station
  • Edgar Dam
  • West Coast refurbishment program
Upgrading our existing system
Building new capacity
  • Cethana pumped hydro
  • Tarraleah redevelopment
Building new capacity
Our power stations
  • Bass Strait islands
  • Yingina / Great Lake
  • Mersey-Forth
  • West Coast
  • Derwent
  • Gordon–Pedder
  • Wind
  • Tamar Valley Power Station
Our power stations
Community
  • Previous grants awarded
  • Join the conversation
Community
Diversity, equity and inclusion
  • Aboriginal and Torres Strait Islander Action Plan
  • Hydro yarns in Lutruwita
Diversity, equity and inclusion

Our energy future

  • Upgrading our existing system
  • Building new capacity
  • Enabling wind and solar
Our energy future
  • Gordon Power Station
  • Edgar Dam
  • West Coast refurbishment program
Upgrading our existing system
  • Cethana pumped hydro
  • Tarraleah redevelopment
Building new capacity

Our energy system

  • Our power stations
  • How energy works
  • Powering Bass Strait islands
Our energy system
  • Bass Strait islands
  • Yingina / Great Lake
  • Mersey-Forth
  • West Coast
  • Derwent
  • Gordon–Pedder
  • Wind
  • Tamar Valley Power Station
Our power stations

Sustainability and community

  • Conservation
  • Climate
  • Community
  • Cultural heritage
  • Diversity, equity and inclusion
Sustainability and community
  • Previous grants awarded
  • Join the conversation
Community
  • Aboriginal and Torres Strait Islander Action Plan
  • Hydro yarns in Lutruwita
Diversity, equity and inclusion

Water

  • Water information
  • Using our water
Water

Things to do

  • Waddamana Heritage Site and Highlands Power Trail
  • Visitor information and safety
Things to do

Stories and news

  • The Spill
  • Media centre
Stories and news

More

  • Careers
  • About us
  • Contractor HSE
  • Education
  • Resource hub
The Spill

Energy and industry

Signal watermark
Featured

Celebrating 50 years of the Gordon Dam

News 18 Dec

Categories

Energy & industry navigation item icon Tasmanian community navigation item icon Environment navigation item icon People & heritage navigation item icon
Recreation navigation item icon
Articles

Accelerating the development of renewable energy in Tasmania

News 10 December 2024

Delivering for Tasmanians: a look back at our annual performance

News 9 December 2024

Upgrading Rowallan Power Station: a testament to teamwork and innovation

Energy & industry 24 November 2024

Generation Hydro shines as a finalist for STEM Communicator of the Year Award!

Tasmanian community 14 November 2024

Meet Kodi: electrifying IT across Tasmania’s power stations

People & heritage 29 October 2024

ROV donation for Tasmania's future scientists

Tasmanian community 7 October 2024

Powering girls towards careers in STEM

Tasmanian community 2 October 2024

Does culture really eat strategy for breakfast?

News 29 September 2024

When it rains, it pours: managing a complex energy network that depends on the weather

News 26 September 2024
Maugean Skate_transparent

It takes sound science to save a species

Environment 26 September 2024
31 to 40 of 157
  • Previous
  • Page 1
  • Page 2
  • Page 3
  • Current page 4
  • Page 5
  • Page 6
  • Page 7
  • Page 8
  • Page 9
  • Next
Hydro Tasmania
Our energy future
  • Building new capacity
  • Upgrading our existing system
  • Enabling wind and solar
Our energy system
  • Our power stations
  • How energy works
  • Powering Bass Strait islands
Sustainability and community
  • Conservation
  • Climate
  • Community
  • Cultural heritage
  • Diversity, equity and inclusion
Things to do
  • Visitor information and safety
  • Waddamana Heritage Site and Highlands Power Trail
Water
Careers
About us
Education
Resource hub
The Spill
Contractor HSE
Contact us
Momentum Energy
Entura
Media centre Privacy
Hydro Tasmania © 2026. All rights reserved.