Logo of Hydro Tasmania Logo of Hydro Tasmania
  • Our energy future
  • Our energy system
  • Sustainability and community
  • Water
  • Things to do
  • Stories and news
Logo of Hydro Tasmania Logo of Hydro Tasmania
Alerts
  • 8 December 2025 Maintenance

    Poatina – boil water

  • 8 December 2025 Maintenance

    Lake Plimsoll – boat ramp closed when lake level is high

  • 8 December 2025 Maintenance

    Lake Mackintosh – campground and boat ramps closed when lake level is high

  • 8 December 2025 Maintenance

    Gowrie Park – do not consume water

  • 8 December 2025 Maintenance

    Bailey Bridge – closed

All alerts
Logo of Hydro Tasmania Logo of Hydro Tasmania
Search

Common search

  • Water

  • Tarraleah

  • Plant

  • Lake level

  • Environmental handbook

  • Our energy future
  • Our energy system
  • Sustainability and community
  • Water
  • Things to do
  • Stories and news
  • Careers
  • About us
  • Contractor HSE
  • Education
  • Resource hub
Alerts
5
Our energy future
  • Upgrading our existing system
  • Building new capacity
  • Enabling wind and solar
Our energy future
Our energy system
  • Our power stations
  • How energy works
  • Powering Bass Strait islands
Our energy system
Sustainability and community
  • Conservation
  • Climate
  • Community
  • Cultural heritage
  • Diversity, equity and inclusion
Sustainability and community
Water
  • Water information
  • Using our water
Water
Things to do
  • Waddamana Heritage Site and Highlands Power Trail
  • Visitor information and safety
Things to do
Stories and news
  • The Spill
  • Media centre
Stories and news
Upgrading our existing system
  • Gordon Power Station
  • Edgar Dam
  • West Coast refurbishment program
Upgrading our existing system
Building new capacity
  • Cethana pumped hydro
  • Tarraleah redevelopment
Building new capacity
Our power stations
  • Bass Strait islands
  • Yingina / Great Lake
  • Mersey-Forth
  • West Coast
  • Derwent
  • Gordon–Pedder
  • Wind
  • Tamar Valley Power Station
Our power stations
Community
  • Previous grants awarded
  • Join the conversation
Community
Diversity, equity and inclusion
  • Aboriginal and Torres Strait Islander Action Plan
  • Hydro yarns in Lutruwita
Diversity, equity and inclusion

Our energy future

  • Upgrading our existing system
  • Building new capacity
  • Enabling wind and solar
Our energy future
  • Gordon Power Station
  • Edgar Dam
  • West Coast refurbishment program
Upgrading our existing system
  • Cethana pumped hydro
  • Tarraleah redevelopment
Building new capacity

Our energy system

  • Our power stations
  • How energy works
  • Powering Bass Strait islands
Our energy system
  • Bass Strait islands
  • Yingina / Great Lake
  • Mersey-Forth
  • West Coast
  • Derwent
  • Gordon–Pedder
  • Wind
  • Tamar Valley Power Station
Our power stations

Sustainability and community

  • Conservation
  • Climate
  • Community
  • Cultural heritage
  • Diversity, equity and inclusion
Sustainability and community
  • Previous grants awarded
  • Join the conversation
Community
  • Aboriginal and Torres Strait Islander Action Plan
  • Hydro yarns in Lutruwita
Diversity, equity and inclusion

Water

  • Water information
  • Using our water
Water

Things to do

  • Waddamana Heritage Site and Highlands Power Trail
  • Visitor information and safety
Things to do

Stories and news

  • The Spill
  • Media centre
Stories and news

More

  • Careers
  • About us
  • Contractor HSE
  • Education
  • Resource hub
On this page
  • Goals and strategy
  • Accountability and leadership
  • Workplace policies and procedures
  • Consultation and communication
  • Health and wellbeing
  • Hazards, risks and opportunities
  • Change management
  • Incident management
  • Injury and illness management
  • Inductions and training
  • Monitoring and measuring
  • Audit and improvement
  • Document and record management
  • Management review
On this page
  • Goals and strategy
  • Accountability and leadership
  • Workplace policies and procedures
  • Consultation and communication
  • Health and wellbeing
  • Hazards, risks and opportunities
  • Change management
  • Incident management
  • Injury and illness management
  • Inductions and training
  • Monitoring and measuring
  • Audit and improvement
  • Document and record management
  • Management review

Management systems

Goals and strategy
Planning and objectives procedure navigation item icon
Accountability and leadership
Accountability and Leadership Procedure navigation item icon Legal and Other Requirements procedure navigation item icon
Workplace policies and procedures

These documents outline our commitment to a safe, respectful, and inclusive workplace and the processes that support it.

Workplace Behaviour and Respectful Interactions Policy navigation item icon Resolving Issues and Concerns Procedure navigation item icon Workplace Breastfeeding Procedure navigation item icon
Consultation and communication
Consultation and Communication Procedure navigation item icon
Health and wellbeing
Workplace Stress and Wellbeing Procedure navigation item icon
Hazards, risks and opportunities
Hazards, Risks and Opportunities procedure navigation item icon
Change management
Management of Change procedure navigation item icon
Incident management
Incident Management and Investigation Procedure navigation item icon
Injury and illness management
Injury Management Procedure navigation item icon
Inductions and training
Awareness, Training and Competency Procedure navigation item icon
Demonstration of Understanding
Basic Rigging navigation item icon Basic Scaffolding navigation item icon Bridge and Gantry Crane navigation item icon Dogging navigation item icon Elevated Work Platform navigation item icon Excavator navigation item icon Forklift navigation item icon Intermediate Rigging navigation item icon Lifting and Rigging Inspections navigation item icon Non-Slewing Mobile Crane navigation item icon Scissor Lift navigation item icon Telehandler (JCB Type) navigation item icon Telehandler (Manitou Type) navigation item icon Universal Terrain Vehicle (UTV) navigation item icon Vehicle Loading Crane navigation item icon
Monitoring and measuring
Selection and Maintenance of Monitoring and measuring Equipment procedure navigation item icon Monitoring and Measuring procedure navigation item icon
Audit and improvement
Internal Audit and Continuous Improvement procedure navigation item icon
Document and record management
Document Management Procedure navigation item icon
Management review
Management review procedure navigation item icon
Hydro Tasmania
Our energy future
  • Building new capacity
  • Upgrading our existing system
  • Enabling wind and solar
Our energy system
  • Our power stations
  • How energy works
  • Powering Bass Strait islands
Sustainability and community
  • Conservation
  • Climate
  • Community
  • Cultural heritage
  • Diversity, equity and inclusion
Things to do
  • Visitor information and safety
  • Waddamana Heritage Site and Highlands Power Trail
Water
Careers
About us
Education
Resource hub
The Spill
Contractor HSE
Contact us
Momentum Energy
Entura
Media centre Privacy
Hydro Tasmania © 2026. All rights reserved.