Logo of Hydro Tasmania Logo of Hydro Tasmania
  • Our energy future
  • Our energy system
  • Sustainability and community
  • Water
  • Things to do
  • Stories and news
Logo of Hydro Tasmania Logo of Hydro Tasmania
Alerts
  • 30 March 2026 Central Highlands

    UPDATE 30 March: Butlers Gorge Road closed 24/7 to end of April

  • 30 March 2026 Central Highlands

    UPDATE 30 March: Lake King William campground remains closed

  • 25 February 2026 North-West

    Lake Gairdner - lake level change

  • 25 February 2026 Central Highlands

    Arthurs Flume - road closure for maintenance work

  • 25 February 2026 Central Highlands

    Poatina lookout - closed until Dec 2027

All alerts
Logo of Hydro Tasmania Logo of Hydro Tasmania
Search

Common search

  • Lake level

  • Water

  • Abc123

  • The

  • Tarraleah

  • Our energy future
  • Our energy system
  • Sustainability and community
  • Water
  • Things to do
  • Stories and news
  • Careers
  • About us
  • Contractor HSE
  • Education
  • Resource hub
Alerts
5
Our energy future
  • Upgrading our existing system
  • Building new capacity
  • Enabling wind and solar
Our energy future
Our energy system
  • Our power stations
  • How energy works
  • Powering Bass Strait islands
Our energy system
Sustainability and community
  • Conservation
  • Climate
  • Community
  • Cultural heritage
  • Diversity, equity and inclusion
Sustainability and community
Water
  • Water information
  • Using our water
Water
Things to do
  • Waddamana Heritage Site and Highlands Power Trail
  • Visitor information and safety
Things to do
Stories and news
  • The Spill
  • Media centre
Stories and news
Upgrading our existing system
  • Gordon Power Station
  • Edgar Dam
  • West Coast refurbishment program
Upgrading our existing system
Building new capacity
  • Cethana pumped hydro
  • Tarraleah redevelopment
Building new capacity
Our power stations
  • Bass Strait islands
  • Yingina / Great Lake
  • Mersey-Forth
  • West Coast
  • Derwent
  • Gordon–Pedder
  • Wind
  • Tamar Valley Power Station
Our power stations
Community
  • Previous grants awarded
  • Join the conversation
Community
Diversity, equity and inclusion
  • Aboriginal and Torres Strait Islander Action Plan
  • Hydro yarns in Lutruwita
Diversity, equity and inclusion

Our energy future

  • Upgrading our existing system
  • Building new capacity
  • Enabling wind and solar
Our energy future
  • Gordon Power Station
  • Edgar Dam
  • West Coast refurbishment program
Upgrading our existing system
  • Cethana pumped hydro
  • Tarraleah redevelopment
Building new capacity

Our energy system

  • Our power stations
  • How energy works
  • Powering Bass Strait islands
Our energy system
  • Bass Strait islands
  • Yingina / Great Lake
  • Mersey-Forth
  • West Coast
  • Derwent
  • Gordon–Pedder
  • Wind
  • Tamar Valley Power Station
Our power stations

Sustainability and community

  • Conservation
  • Climate
  • Community
  • Cultural heritage
  • Diversity, equity and inclusion
Sustainability and community
  • Previous grants awarded
  • Join the conversation
Community
  • Aboriginal and Torres Strait Islander Action Plan
  • Hydro yarns in Lutruwita
Diversity, equity and inclusion

Water

  • Water information
  • Using our water
Water

Things to do

  • Waddamana Heritage Site and Highlands Power Trail
  • Visitor information and safety
Things to do

Stories and news

  • The Spill
  • Media centre
Stories and news

More

  • Careers
  • About us
  • Contractor HSE
  • Education
  • Resource hub
Back
Documents
  • Share logo
  • Facebook logo
  • X logo
  • Linkedin logo

Resolving Issues and Concerns Procedure

This procedure outlines the options and processes for resolving issues and concerns within the Hydro Tasmania group in relation to conduct that is or may be inconsistent with the standards of behaviour set out in the Code of Conduct and Workplace Behaviour and Respectful Interactions Policy.
Download

Resolving Issues and Concerns Procedure.pdf 200.65 KB, PDF
Back
  • Share logo
  • Facebook logo
  • X logo
  • Linkedin logo
Related
Tarraleah Redevelopment - Project Overview March 2026

Documents

pdf
Wholesale regulated pricing 20260317

Documents

xlsx
Aboriginal and Torres Strait Islander Commitment and Action Plan

Documents

pdf
Regulated Wholesale Pricing Model 24-2-26

Documents

xlsx
Risk Management Committee Terms of Reference 2026

Documents

pdf
People, Culture & Safety Committee Terms of Reference 2026

Documents

pdf
Hydro Tasmania
Our energy future
  • Building new capacity
  • Upgrading our existing system
  • Enabling wind and solar
Our energy system
  • Our power stations
  • How energy works
  • Powering Bass Strait islands
Sustainability and community
  • Conservation
  • Climate
  • Community
  • Cultural heritage
  • Diversity, equity and inclusion
Things to do
  • Visitor information and safety
  • Waddamana Heritage Site and Highlands Power Trail
Water
Careers
About us
Education
Resource hub
The Spill
Contractor HSE
Contact us
Momentum Energy
Entura
Media centre Privacy
Hydro Tasmania © 2026. All rights reserved.