Logo of Hydro Tasmania Logo of Hydro Tasmania
  • Our energy future
  • Our energy system
  • Sustainability and community
  • Water
  • Things to do
  • Stories and news
Logo of Hydro Tasmania Logo of Hydro Tasmania
Alerts
  • 8 December 2025 Maintenance

    Poatina – boil water

  • 8 December 2025 Maintenance

    Lake Plimsoll – boat ramp closed when lake level is high

  • 8 December 2025 Maintenance

    Lake Mackintosh – campground and boat ramps closed when lake level is high

  • 8 December 2025 Maintenance

    Gowrie Park – do not consume water

  • 8 December 2025 Maintenance

    Bailey Bridge – closed

All alerts
Logo of Hydro Tasmania Logo of Hydro Tasmania
Search

Common search

  • Water

  • Tarraleah

  • Plant

  • Lake level

  • Environmental handbook

  • Our energy future
  • Our energy system
  • Sustainability and community
  • Water
  • Things to do
  • Stories and news
  • Careers
  • About us
  • Contractor HSE
  • Education
  • Resource hub
Alerts
5
Our energy future
  • Upgrading our existing system
  • Building new capacity
  • Enabling wind and solar
Our energy future
Our energy system
  • Our power stations
  • How energy works
  • Powering Bass Strait islands
Our energy system
Sustainability and community
  • Conservation
  • Climate
  • Community
  • Cultural heritage
  • Diversity, equity and inclusion
Sustainability and community
Water
  • Water information
  • Using our water
Water
Things to do
  • Waddamana Heritage Site and Highlands Power Trail
  • Visitor information and safety
Things to do
Stories and news
  • The Spill
  • Media centre
Stories and news
Upgrading our existing system
  • Gordon Power Station
  • Edgar Dam
  • West Coast refurbishment program
Upgrading our existing system
Building new capacity
  • Cethana pumped hydro
  • Tarraleah redevelopment
Building new capacity
Our power stations
  • Bass Strait islands
  • Yingina / Great Lake
  • Mersey-Forth
  • West Coast
  • Derwent
  • Gordon–Pedder
  • Wind
  • Tamar Valley Power Station
Our power stations
Community
  • Previous grants awarded
  • Join the conversation
Community
Diversity, equity and inclusion
  • Aboriginal and Torres Strait Islander Action Plan
  • Hydro yarns in Lutruwita
Diversity, equity and inclusion

Our energy future

  • Upgrading our existing system
  • Building new capacity
  • Enabling wind and solar
Our energy future
  • Gordon Power Station
  • Edgar Dam
  • West Coast refurbishment program
Upgrading our existing system
  • Cethana pumped hydro
  • Tarraleah redevelopment
Building new capacity

Our energy system

  • Our power stations
  • How energy works
  • Powering Bass Strait islands
Our energy system
  • Bass Strait islands
  • Yingina / Great Lake
  • Mersey-Forth
  • West Coast
  • Derwent
  • Gordon–Pedder
  • Wind
  • Tamar Valley Power Station
Our power stations

Sustainability and community

  • Conservation
  • Climate
  • Community
  • Cultural heritage
  • Diversity, equity and inclusion
Sustainability and community
  • Previous grants awarded
  • Join the conversation
Community
  • Aboriginal and Torres Strait Islander Action Plan
  • Hydro yarns in Lutruwita
Diversity, equity and inclusion

Water

  • Water information
  • Using our water
Water

Things to do

  • Waddamana Heritage Site and Highlands Power Trail
  • Visitor information and safety
Things to do

Stories and news

  • The Spill
  • Media centre
Stories and news

More

  • Careers
  • About us
  • Contractor HSE
  • Education
  • Resource hub
On this page
  • Permit to Work
  • Permit to Work Flowcharts
  • Isolations
On this page
  • Permit to Work
  • Permit to Work Flowcharts
  • Isolations

Permit to Work and Isolations

Permit to Work
Permit to work Procedure navigation item icon Permit to work form navigation item icon Master permit to work form navigation item icon Subsidiary permit to work log navigation item icon Change of condition sheet navigation item icon PIC tracking and Acknowledgement Sheet navigation item icon Risk Control attachment tracking sheets navigation item icon Safety observer – tracking and acknowledgement sheet navigation item icon Work party tracking and acknowledgement sheet navigation item icon PIC selection assessment tool navigation item icon
Permit to Work Flowcharts
Requirement to use a permit to work navigation item icon Master permit to work navigation item icon Single permit to work navigation item icon Subsidiary permit to work navigation item icon PIC leaves or returns to the work site navigation item icon Change of PIC navigation item icon Permit to work flow chart (change of conditions) navigation item icon Isolation addition deletion navigation item icon Suspension and reactivation navigation item icon
Isolations
Isolation procedure navigation item icon Master schedule of planned operations (SOPO) navigation item icon Schedule of planned operations (SOPO) form navigation item icon Pre-approved schedule of planned operations navigation item icon Isolation addition/deletion sheet navigation item icon Operational procedure template navigation item icon Personal Isolation lock issue register – temporary issue navigation item icon Personal isolation lock – tag removal form navigation item icon
Hydro Tasmania
Our energy future
  • Building new capacity
  • Upgrading our existing system
  • Enabling wind and solar
Our energy system
  • Our power stations
  • How energy works
  • Powering Bass Strait islands
Sustainability and community
  • Conservation
  • Climate
  • Community
  • Cultural heritage
  • Diversity, equity and inclusion
Things to do
  • Visitor information and safety
  • Waddamana Heritage Site and Highlands Power Trail
Water
Careers
About us
Education
Resource hub
The Spill
Contractor HSE
Contact us
Momentum Energy
Entura
Media centre Privacy
Hydro Tasmania © 2026. All rights reserved.