Safety

Serious about safety

We take safety seriously at Hydro Tasmania. From the smallest detail in day-to-day operations to the very top - being one of our values

Our safety vision is “No harm to anyone at anytime”. This shows that we want to stay focused on keeping people safe.

Our formal OH&S Commitment extends to employees, contractors and visitors alike, as well as making sure our assets and operations don’t put the general community at risk.

Click on the image to download our OH&S Commitment.  

Contractor occupational health and safety

This page is for use by Hydro Tasmania staff and contractors to obtain all the information they will need when working on Hydro Tasmania sites. Please take the time to read the disclaimer below

Click on the icon in the below table to download the document. If you are having difficulties please contact us using the details on the right hand side of this page.

Our work sites are varied and include office buildings through to power stations, dams, canals and green-field construction sites all with very different risks. As such, the requirement for training increases for those working in high risk hazardous areas. Hydro Tasmania has built on the good work of Tasmanian Power System Safety Rules system(P.S.S.R) to form a new Permit To Work system (PTW). Our PTW system provides better protection when working on both mechanical and civil assets, as well as electrical assets which are the primary focus in the PSSR system. This does mean that the specific PTW training is required to work on Hydro Tasmania sites.

Level 2 inductions – REFRESHER REQUIREMENTS

All contractors are individually responsible for ensuring that their training and induction are current before they arrive to work on a Hydro Tasmania site. This includes level 2 induction.

To arrange a level 2 induction, contact your Hydro Tasmania representative. You can download the HSE induction handbook from this page (under the “Induction” tab).

Disclaimer

The information provided in this web page, including the documents listed are not a definitive guide to Hydro Tasmania's Health, Safety and Environmental (HSE) Management requirements or the HSE Management System. The most recent version of HSE documentation should always be consulted for accurate information on HSE management requirements. Contractors should be aware of the HSE management requirements outlined in their contract with Hydro Tasmania and always discuss the HSE management requirements with the Hydro Tasmania Contract Manager before arriving on site or commencing any work for Hydro Tasmania.

Safety Leadership

Corporate Induction(Level 1) – Required to work in corporate offices (delivered on site)
Health, Safety and Environment Handbook Induction (Level 2) - Required by all persons working on our sites.
doc
Procedure

(3.79 MB)
Site Induction (Level 3) – Required by all persons working on our sites. Specific information for every different site will be delivered on site.
-
Hydro Tasmania Instructed Person (IP)Training under Hydro Tasmania’s PTW system – required by all persons working on Hydro Tasmania high risk sites involving PTW system permits
pdf
Procedure

(2.37 MB)
Hydro Tasmania Person In Charge (PIC) - Training under Hydro Tasmania’s PTW system – required by all persons supervising work on Hydro Tasmania high risk sites involving PTW system permits
Hydro Tasmania Authorised Issuing Officer (AIO) - Training under Hydro Tasmania’s PTW system – required by all persons issuing permits on Hydro Tasmania high risk sites involving PTW system permits
Hydro Tasmania safe work practices handbook
pdf
Procedure

(1.67 MB)
Cardinal rules
doc
Procedure

(400.5 KB)
Workplace Health and Safety Commitment
pdf
Procedure

(497.74 KB)

Safe Systems

HSE Management of Contractors & Suppliers
doc
Procedure

(919.5 KB)
Contractor Job Health Safety & Environmental Requirements
doc
Procedure

(299 KB)
Contractor HSE Questionnaire
doc
Procedure

(83.36 KB)
Self rescue equipment
doc
Procedure

(420 KB)
Incident Management
doc
Procedure

(983.5 KB)
Investigation methodology guide
doc
Procedure

(170 KB)
Severity and notification guide
doc
Procedure

(236 KB)
Job hazard analysis (JHA) and Take 5
doc
Procedure

(702.5 KB)
Safe act observation field checklist (SAO)
pdf
Checklist

(21.54 KB)
Workplace hazard register procedure
doc
Procedure

(692 KB)
Concealed services
doc
Procedure

(1.07 MB)
Confined space
doc
Procedure

(1.48 MB)
Atmospheric testing sheet
doc
Permit/Form

(78.5 KB)
Signature sheet
doc
Permit/Form

(88 KB)
Diving
doc
Procedure

(1.36 MB)
Excavation and site works
doc
Checklist

(117 KB)
Hot work
doc
Procedure

(822.5 KB)
Isolation
doc
Procedure

(1.61 MB)
Personal isolation lock: tag removal form
doc
Permit/Form

(101.5 KB)
Personal isolation lock issue register: temporary issue
doc
Procedure

(79.5 KB)
Master schedule of planned operations
xls
Procedure

(66.5 KB)
Schedule of planned operations
doc
Permit/Form

(137 KB)
Permit to work
doc
Procedure

(11.66 MB)
Work party: tracking and acknowledgement sheet
doc
Procedure

(135 KB)
Person in charge: tracking and acknowledgement sheet
doc
Procedure

(145 KB)
Safety observer: tracking and acknowledgement sheet
doc
Procedure

(143 KB)
Change of condition sheet
doc
Procedure

(108 KB)
Master permit to work
doc
Procedure

(199.5 KB)
Master permit to work - subsidiary permits to work log
doc
Procedure

(166 KB)
Visitor site access
doc
Checklist

(128 KB)

Safe People and Practices

Alcohol and other drugs
doc
Procedure

(259.5 KB)
Fatigue management
doc
Procedure

(1.2 MB)
Hearing conservation
doc
Procedure

(474.5 KB)
Asbestos Management Procedure & Asbestos sheeting removal less than 10 meters
doc
Procedure

(711.5 KB)
Asbestos - drilling
doc
Checklist

(168 KB)
Asbestos - gasket and packing removal
doc
Checklist

(155.5 KB)
Manual handling
doc
Checklist

(92 KB)
Personal protective equipment
doc
Procedure

(517.5 KB)
Remote area and working alone
doc
Procedure

(1.76 MB)
Removal of minor quantities of lead based paint
doc
Checklist

(90.5 KB)
Angle grinder
doc
Checklist

(139.5 KB)
Chainsaw safety
doc
Checklist

(128 KB)
Compressed air
doc
Checklist

(95 KB)
Crane lift study
doc
Checklist

(211.5 KB)
Dogging and rigging
doc
Checklist

(125.5 KB)
Grit blasting and painting
doc
Checklist

(134.5 KB)
HYTORC spanner
doc
Checklist

(138.5 KB)
Use of vehicles and fuel burning plant in underground facilities
doc
Procedure

(433.5 KB)
Welding
doc
Checklist

(120.5 KB)
Safe transport of gas cylinders
doc
Checklist

(113 KB)
Transport
doc
Checklist

(149 KB)
Electrical safety
doc
Checklist

(135.5 KB)
Live panel
doc
Checklist

(133 KB)
Scientific snorkelling
doc
Procedure

(507 KB)
Seismic survey safety
doc
Procedure

(1.14 MB)
Underground safety
doc
Procedure

(420 KB)
Voyage operational checklist
doc
Checklist

(118 KB)
Water safety for small vessels and wading
doc
Procedure

(770 KB)
Working at heights
doc
Procedure

(559.5 KB)